Backyard Memmingen
In summer 2015, the GEO-BOHRTECHNIK GmbH drilled in a backyard in Memmingen.
Self-drilling anchors in Sulz am Neckar
In summer 2014, the GEO-BOHRTECHNIK GmbH was drilling self-drilling anchors in Sulz am Neckar.
Bahnhof Mühlacker
Ab Februar 2014 bohrte die GEO-BOHRTECHNIK GmbH am Bahnhof Mühlacker bei Pforzheim.
Solnhofer Cement Plant
GEO-BOHRTECHNIK GmbH drilled at the Solnhofer Cement Plant in august 2013.
Station Schwäbisch Gmünd
GEO-BOHRTECHNIK GmbH drilled at the station Schwäbisch Gmünd from the beginning of april 2013.
Renewal railway bridge Kirchheim/Neckar
GEO-BOHRTECHNIK GmbH drilled under a railwaybridge in Kirchheim/Neckar from the 7th of jan. 2013 on.
Stuttgart U12 Station Remseck
The GEO-BOHRTECHNIK GmbH drilled 12 Micropiles for the foundation of a railway platform.
Stuttgart U12 second stage
This project was terminated by drilling of 4 micropiles in spring 2016.