In August 2015, the GEO-BOHRTECHNIK GmbH drilled at the Hospital Memmingen.
An infiltration hole for rainwater in a narrow shaft had to be created. It was drilled a 5" injection well with a drilling diameter of 300mm. Because of the cramped conditions and the depth a small drilling rig was lifted by a mobile crane.