The GEO-BOHRTECHNIK GmbH invested in a general overhaul.
The rig was in operation since 1991. As the old chassis was completely worn out, a new MB Unimog U5000 was purchased and the rig after the complete overhaul was adapted. In the end a new drilling rig has been created.